R14Services(Rhythm)Signature

Predictive maintenance

Maintenance by condition, not the calendar: runtime hours, rising indoor PM2.5, actual use and predicted failures raise work; response per asset class: Advise, Ask or Autonomous

Simulate
Readiness
0 Concept
Release wave
Wave 3 (Q2 to Q3 2027)
Group
Maintain
Risk tier
R1
Autonomy at design
Ask
Autonomy at launch
Ask
Version
2.0.0

Settings: Response per asset class, confidence, Runtime hours, PM2.5 trend threshold, Use thresholds

Serve

Who benefits
Everyone relying on equipment
Adverse experience to avoid
Autonomous action on critical plant without approval

Authority

System owners
FM owner, Workplace owner
Declared scopes
A01A02A05A16A48A51

Flow

When
Triggers
T40Failure predictedPredicted

Failure predicted

T06ScheduleRuntime, Use

Daily

T18Environment thresholdAir

Indoor PM2.5 rising

If
Context
C41Health historyPredicted, Use

Health history

TTL 120s · on unknown: skip

C40Asset class rulePredicted

Asset class rule

TTL 120s · on unknown: skip

C23BMS point stateRuntime

Runtime hours

TTL 120s · on unknown: skip

C21Environment readingAir

Environment reading

TTL 120s · on unknown: skip

Then
Ask and act
A01Notifys8Predicted

Advise: alert the team

RiskR0
Conflict key
none
Compensation
none
Retry safe
Yes with dedup
A02Ask with answers9Predicted

Ask: approve the draft work order

RiskR0
Conflict key
run:{run}:ask
Compensation
withdraw the ask
Retry safe
Yes with dedup

Timeout 600s · on timeout: compensate

A48Field Service work orders10Predicted

Create the work order

RiskR1
Conflict key
workorder:{asset}
Compensation
cancel the work order
Retry safe
Yes with key
A51Reserve spares11Predicted

Reserve a spare

RiskR1
Conflict key
spare:{asset}
Compensation
release the spare
Retry safe
Yes with key
A05Move bookings12Predicted

Move upcoming bookings off the room

RiskR1
Conflict key
booking:{booking}
Compensation
move back to the original room
Retry safe
Yes with key
A16Raise tickets14Runtime, Air, Use

Filter ticket

RiskR1
Conflict key
ticket:{asset}:{category}
Compensation
cancel the ticket
Retry safe
Yes with key
Verify
Read-back
V12Work order closeds13Predicted

Work order closed

V09Environment back in bands16Air

PM2.5 back in band

V08Ticket closeds15Runtime, Use

Ticket closed

Evidence

Time stage
Meet
Metric
Downtime minutes avoided
Basis
Modelled
Evidence grade
Modelled
Fallback on failure
Holds released and steps compensated; requester notified