1-PlatformPlaybook Studio
Author: drafts onlyOffline catalogue

Play library

SETOS plays by pack. Open a play to see its flow, simulate it or duplicate it as a draft.

68
Plays
26
Signature
8
Launch set
29
Engine-ready

Space (Gravity)

14
G01SignatureR1

Bounce rescue

A failed room or desk search comes back to the person when a fitting space frees up, first in first out

Launch (Jan 2027)Launch: Ask0 ConceptEngine-ready
G02ExperienceR1

Right room

Offers a better-sized or closer room at booking, for a recurring series that runs under capacity and as rooms free up

Wave 3 (Q2 to Q3 2027)Launch: Ask0 ConceptEngine-ready
G03ExperienceR1

Fair share

When a room is contested: splits, swaps and new slots between peers; asks the holder of an internal meeting to move under the customer's published service priority policy; department heads request team rooms; ask, never force

Wave 2 (Q1 2027)Launch: Ask0 Concept
G08SignatureR1

Ghost release

Returns unused rooms, desks and bays to the queue on multi-signal evidence: asks organisers who are away or whose attendees all declined to release early, releases no-shows after the grace period and frees rooms that end early; unknown is never treated as empty

Wave 2 (Q1 2027)Launch: Ask0 ConceptEngine-ready
G10ExperienceR1

Best time to meet

Finds the slot when a fitting room and every internal attendee are free and warns when the chosen slot is usually full

Wave 3 (Q2 to Q3 2027)Launch: Advise0 ConceptEngine-ready
G20SignatureR3

Space flex

Supply follows demand: opens idle rooms or an overflow floor when demand passes supply, consolidates quiet days onto fewer floors and keeps unbooked floors in setback

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified1 Located
G14ExperienceR3

Divisible rooms

Whole or split hall rules, layouts, setup buffers and supplier engagement, with the BMS scene for each layout

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified1 Located
G16ExperienceR2

Room reputation

Repeat faults and low one-tap ratings rank a room lower in search until it is fixed and rated well again

Wave 3 (Q2 to Q3 2027)Launch: Ask0 ConceptEngine-ready
G17ExperienceR1

Sit with your team

Holds a neighbourhood on team days, offers desks near teammates who opted in and allocates the nearest free locker with the desk

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 ConceptEngine-ready
G23SignatureR1

Parking surge

Days ahead, forecasts a bay crunch or a gate queue; releases a staff zone, offers car-pooling or a sponsored pickup and nudges flexible staff to a quieter arrival slot

Wave 2 (Q1 2027)Launch: Ask0 Concept
G33ExperienceR0

Lunch flow

Live cafeteria status on signage and the app before the rush, guiding people to the quieter option, plus each person's quietest window today

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
G42ExperienceR0

Crowd comfort

Live counts redirect people before spaces crowd: free bays by level, busy atriums and halls, spaces nearing safe capacity (observe and notify only)

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 ConceptEngine-ready
G41ExperienceR2

Space to revenue

A forecast idle window in a hall or room is offered to approved external users or tenants

Wave 3 (Q2 to Q3 2027)Launch: Ask1 Located
G48SignatureR3

Unauthorized room use

A room in use without a booking: help first by inviting an authenticated booking with a grace period; ventilation is never reduced while occupied; light purple and a panel message; panel lock and wireless end are customer policy steps (default Ask); facilities after 10 minutes

Wave 2 (Q1 2027)Launch: Ask0 Concept

Energy (Balance)

10
B01SignatureR3

Ready on booking

HVAC, lights and blinds reach comfort 15 minutes before a booked meeting, sized to its attendees, with a fresh-air flush before the first booking of the day

Launch (Jan 2027)Launch: Advise1 Located
B03ExperienceR3

Occupancy mode

Writes the BMS occupancy mode per zone from a four-state space matrix with data freshness: Booked to Standby, Occupied to Occupied, Free or Ghost to Unoccupied; a manual BMS override always wins

Wave 2 (Q1 2027)Launch: Ask1 Located
B04ExperienceR3

Daylight

Blinds follow sun position and façade, adjusted for bookings; perimeter lights dim when daylight is enough

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
B06ExperienceR3

Comfort request

"Too cold" on the room panel or app adjusts within the band and logs it; repeat complaints in a zone become a setpoint offset proposal or a fault ticket

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
B10SignatureR3

Arrival-aware start

The first badge or plate starts the floor, not a fixed 06:00; a late booking or after-hours entry conditions only that zone, with an end time

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified1 Located
B12SignatureR3

Air on demand

Modulates fresh air to CO₂, TVOC and occupancy within the certified fresh-air limits; on dust days caps fresh air at the certified minimum, never below; flags humidity before condensation or mould

Wave 3 (Q2 to Q3 2027)Launch: Ask0 Concept
B19SignatureR3

Peak shave

A forecast peak or a district cooling draw near contracted capacity brings pre-cooling earlier, staggers AHUs, dims non-critical lighting and shifts EV charging; plans the next day from bookings and weather

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
B23ExperienceR2

EV charge fit

Charger bays allotted with the booking and charging fitted around building load

Wave 3 (Q2 to Q3 2027)Launch: Ask1 Located
B29ExperienceR3

After-hours sweep

At closing, lights go off floor by floor where nobody is in; panels, screens, codecs and signage sleep where no booking follows, with override

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified1 Located
B32ExperienceR3

Waste watch

Energy and water waste caught as it happens: a door held open on a cooled zone, a zone cooled with nobody in it, night baseload creeping up, a leak or abnormal night flow

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept

Time (Cue)

9
C06ExperienceR1

Time to go

Gets people to meetings on time: a leave nudge allowing for distance, lift and parking; a countdown with room, guest status and Teams fallback; back-to-back meetings too far apart get online or a closer room

Wave 2 (Q1 2027)Launch: Advise0 ConceptEngine-ready
C08SignatureR3

Pre-flight check

The existing autonomous pre-flight play with four profiles (VIP, with external guests, internal, classroom): sets the scene for the meeting type, checks room, AV and services before the start; a fault is fixed or the meeting moves before anyone arrives; unverified checks show as unknown

Launch (Jan 2027)Launch: Ask until site certified0 Concept
C12SignatureR2

Keep going next door

Room extend and transfer: 5 minutes before the end, offers to extend; overrunning with the next group waiting, a nearby room and the call are moved

Launch (Jan 2027)Launch: Ask0 ConceptEngine-ready
C17ExperienceR1

Morning brief

Desk, rooms, parking, visitors and anything changed in one note; the evening before, plans tomorrow's desk, parking and best arrival time; offers a quiet space for free focus blocks

Wave 2 (Q1 2027)Launch: Advise0 ConceptEngine-ready
C23SignatureR0

Tomorrow's heads-up

Tomorrow's peaks go to reception, security, housekeeping and catering the day before, with headcount per cafeteria and a crew plan from bookings and events

Wave 3 (Q2 to Q3 2027)Launch: Advise0 Concept
C22ExperienceR3

Calendar shift

One approval shifts BMS schedules, booking hours, reminders, setbacks and services for Ramadan, public holidays and long weekends, then returns them at the end date

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
C27UtilityR1

Due date radar

Licences, contracts, inspections, certificates and warranties flagged at 90, 60 and 30 days with owner and cost; compliance items become tickets before they are due

Wave 3 (Q2 to Q3 2027)Launch: Advise0 ConceptEngine-ready
C33SignatureR0

Minutes on time

The host sets session languages, recording and recipients; latecomers get a 30-second recap; minutes, decisions, actions and transcript go out within minutes; owners are nudged before actions are due

Wave 2 (Q1 2027)Launch: Autonomous0 Concept
C36ExperienceR0

Class attendance

Opt-in attendance for classes and training by QR, badge or FaceMe with consent, counted per timetable session; teachers see who is present, the institution sees counts

Wave 2 (Q1 2027)Launch: Autonomous0 ConceptEngine-ready

People (Host)

11
H01ExperienceR3

Invite and arrive ready

The guest gets a QR code, a reserved bay with the plate pre-registered, directions, Wi-Fi and a guest guide; accessible guests get an accessible bay, staff at the gate and a step-free route

Wave 2 (Q1 2027)Launch: Ask until site certified0 ConceptEngine-ready
H02SignatureR3

Delegation plan

One plan for a group: parking block, zone opened and prepared, access, catering, protocol order and interpreter

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified1 Located
H05SignatureR0

Voice before arrival

Optional voice enrolment with explicit consent, retention and revocation sent with the invite, so MATT can name the guest from the first sentence; MATT works fully without it

Wave 2 (Q1 2027)Launch: Ask0 ConceptEngine-ready
H06SignatureR1

Welcome journey

Welcome by private channel by default (host app, room panel, lift screen with initials only on opt-in); the host is alerted at plate entry with an ETA and again at the floor; a guest waiting over 5 minutes gets reception, a drink and a host nudge

Wave 2 (Q1 2027)Launch: Ask0 ConceptEngine-ready
H11ExperienceR1

Hospitality on cue

A booking template books catering, setup and AV support together; refreshments follow the guests' opt-in preferences and are served at the start and refreshed at the midpoint; a tap brings service to the room

Wave 2 (Q1 2027)Launch: Autonomous0 ConceptEngine-ready
H13SignatureR0

Live translation

Live translation and captions in the session languages, attributed to enrolled speakers

Wave 2 (Q1 2027)Launch: Autonomous0 Concept
H16ExperienceR3

Smooth exit

Gate opens for the guest plate, badge reminder and taxi if needed; one-tap feedback for the guest and a visit summary to the host; passes expire and guest data is handled per policy

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 ConceptEngine-ready
H19ExperienceR3

Settings follow you

Opt-in comfort, light and language applied wherever you book; an accessibility profile steers desks, rooms and routes and flags evacuation assistance to Shield

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
H23ExperienceR1

Event day

A registered event gets a parking block, attendee QR codes, badges, seating, live headcount, signage routes to the hall and staffing notice from the headcount

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 ConceptEngine-ready
H25ExperienceR0

Moments

Celebrate, Inform and Page on public screens by display group; paging by cause and effect

Wave 2 (Q1 2027)Launch: Autonomous0 ConceptEngine-ready
H27ExperienceR3

Exam day

An exam session takes its rooms out of booking, sets access windows, quiet signage and comfort, notifies invigilators and releases everything at the end

Wave 2 (Q1 2027)Launch: Ask until site certified0 Concept

Services (Rhythm)

9
R01SignatureR3

Clean by use

Washroom visits and odour, meeting use and desk use create cleaning tasks, not fixed rounds: exhaust boost then a clean for washrooms, a quick reset before the next booking, used desks cleaned tonight; odour checked back in band

Wave 2 (Q1 2027)Launch: Ask until site certified0 Concept
R07ExperienceR1

Bin-fill routes

Bins above 80% create a pickup on an optimised route; empty bins are skipped

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
R08ExperienceR1

Restock by use

Supply stations, washroom consumables and pantry are restocked by actual consumption, visits and booked meetings

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
R11SignatureR1

Fault to fix

Any fault (device health, a room off setpoint, an AV or BMS fault or a user report with a photo) is tried with a restart where allowed, then becomes one ticket for the right team with an SLA, before and after photos and a read-back check

Launch (Jan 2027)Launch: Autonomous (allow-listed restart; disruptive actions Ask)0 ConceptEngine-ready
R12ExperienceR3

Planned maintenance

A planned work order from Field Service becomes a prepared visit: space out of booking, meetings moved, access window, orange light, result checked and work order closed

Wave 2 (Q1 2027)Launch: Ask until site certified0 Concept
R14SignatureR1

Predictive maintenance

Maintenance by condition, not the calendar: runtime hours, rising indoor PM2.5, actual use and predicted failures raise work; response per asset class: Advise, Ask or Autonomous

Wave 3 (Q2 to Q3 2027)Launch: Ask0 Concept
R17SignatureR1

Cancelled meeting outcome

A cancelled or ghost-released booking cancels its parking, pantry, setup, AV support and signage before cut-off, skips the clean if unused, tells requester and vendors and logs the saving

Wave 2 (Q1 2027)Launch: Autonomous0 ConceptEngine-ready
R21ExperienceR1

Assets home

Zone and last-seen time for every tagged asset; anything unseen for 7 days is flagged; borrowed equipment not back after its booking gets a reminder, then a ticket

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
R25ExperienceR0

Smart rounds

Cleaning, supplies and engineering rounds with QR or tag checkpoints; missed checkpoints are flagged; security patrols are in Shield

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 ConceptEngine-ready

Resilience (Shield)

10
S02ExperienceR0

Access watch

Entry outside hours with no booking or permit, more people through a door than badges and unregistered plates in staff or VIP zones go to security with context

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
S03UtilityR3

Access review

Unused cards, leavers still active and levels never used, quarterly and on a leaver event; the owner approves each removal

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 ConceptEngine-ready
S05SignatureR0

Muster count

Supports the certified evacuation process: live known and unknown counts per assembly point from badges and opt-in tags, assistance flags first, alarm and all-clear times recorded, drill mode; never declares everyone safe

Wave 2 (Q1 2027)Launch: Ask0 Concept
S06ExperienceR0

Duress and lone worker

A smart button, panel duress or wearable SOS sends a silent alarm with location and confidence, acknowledged dispatch, retries and escalation; opt-in lone workers who miss a check-in are escalated; the native panic path keeps working without SETOS

Wave 2 (Q1 2027)Launch: Ask0 ConceptEngine-ready
S09ExperienceR0

Zone watch

A visitor or contractor tag leaves its permitted zone or enters an escort-required area without the host; host and security are alerted with the live zone

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 Concept
S11ExperienceR3

Contractor permit

The permit is checked at arrival and sets zones, hours and the access window; work outside them alerts the permit owner; access expires on time with a renewal ask

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept
S12ExperienceR0

Smart patrols

Security rounds with beacon or QR checkpoints on randomised routes; a missed checkpoint escalates

Wave 3 (Q2 to Q3 2027)Launch: Autonomous0 ConceptEngine-ready
S13SignatureR1

Incident to closure

Any alarm (door held or forced, VMS, duress, leak or report) brings up the nearest camera and becomes one incident with owner, SLA, evidence and close-out

Wave 2 (Q1 2027)Launch: Autonomous0 ConceptEngine-ready
S17UtilityR3

Outage mode

Power, network or cloud link lost: rooms, panels and plays drop to day-one mode, facilities told, recovery verified

Launch (Jan 2027)Launch: Autonomous (fallback only, no control writes)0 Concept
S18ExperienceR3

Weather day

Heat above the threshold, sandstorms and severe weather: shaded bays for guests, earlier pre-cooling, staff notices, remote-work advice and outdoor areas closed

Wave 3 (Q2 to Q3 2027)Launch: Ask until site certified0 Concept

Intelligence (Foresight)

5